Measurement methods for building -- Setting-out and measurement -- Part 1: Planning and organization, measuring procedures, acceptance criteria
2011
رقم المستند: NL ISO 4463 1 : 2011
القطاع: Construction materials and building
TC: NL TC 59
ICS:
This part of ISO 4463 deals with the progressive stages of setting-out work in building construction, i.e. acquisition of in- formation, establishing the primary System, setting-out the secondary System, vertical transfer of Points in the secondary System to other levels, and setting-out the Position Points and the establishment and transfer of levels (bench marks). In addition it gives values of permitted deviations and guidance on independent check measurements (quality control) using in- struments and methods currently in common use at each Stage of the setting-out process.